skip to main
|
skip to sidebar
MK MIDI ZX12R
Tuesday, 4 May 2010
Rolled Out
Dash Installed
Sunday, 11 April 2010
Cycle Wings
Front and rear cycle wings fitted.
Saturday, 13 March 2010
Diff / Driveshafts Installed
Modified Driveshafts
Sunday, 7 March 2010
First Start
ZX12 Loom
Bike loom and engine management installed.
Loom was shortened to fit the space in the rear of the car
Removed this lot!!!!
Bike loom with wires removed not needed for engine management.
Wednesday, 3 February 2010
Pedal box / Steering column
Engine fitted
Cage
Sunday, 17 January 2010
Test Fit Panels
Fuel Tank Firewall
Fuel Tank
Using the fuel pump and sender from the ZX12
Tuesday, 5 January 2010
Front Suspension
Side Panels
Newer Posts
Older Posts
Home
Subscribe to:
Posts (Atom)
Blog Archive
►
2012
(1)
►
May
(1)
►
2011
(1)
►
May
(1)
▼
2010
(14)
▼
May
(2)
Rolled Out
Dash Installed
►
April
(1)
Cycle Wings
►
March
(3)
Diff / Driveshafts Installed
First Start
ZX12 Loom
►
February
(3)
Pedal box / Steering column
Engine fitted
Cage
►
January
(5)
Test Fit Panels
Fuel Tank Firewall
Fuel Tank
Front Suspension
Side Panels
►
2009
(4)
►
December
(4)
About Me
Dazz
View my complete profile
LINKS
MK Engineering